Showing posts with label Wing. Show all posts
Showing posts with label Wing. Show all posts

Thursday, April 21, 2011

A New Venture

I haven't finished up the riveting of the second flaperon over the last couple of evenings because I've been saving it up for my scheduled Aviation Venture Crew on Thursday night. What's an "Aviation Venture Crew" you ask? Well, peruse these purloined paragraph that I pilfered from the nets:


  • What is a Venture Crew? A Venture Crew is a group of young men and women (ages 14-20) who gather to learn about and engage in a high adventure activity. The group is sponsored by a committee of adults as well as a sponsoring organization. This program is run under the direction and guidelines of the Boy Scouts of America, but is a coed program.




  • What is an Aviation Venture Crew? An Aviation Venture Crew concentrates is meetings and activities around the many fields involved in aviation, including piloting, maintenance, traffic control, and operations.



  • I figured a little riveting would be just the ticket. It's easy to teach and hard to mess up, and people really seem to like it. After a few minutes (that I'm sure seemed like hours) of me pontificating on my two favorite subjects, those being 1) airplanes, and 2) well, me, I turned Co-pilot Egg loose to train any willing volunteers and get some riveting done:





    Time ran out before we could rivet the bottom of the skins, so I'll take care of that this weekend. Then it's on to the finishing kit!!

    Saturday, April 16, 2011

    Writer's cramp

    If this blog was all you had to go by, you'd think I had completely given up on the RV-12. While that's at least partially true, I have in fact been working on it now and then; I'm still working on the right side flaperon. Since the right side flaperon is pretty much just like the left side flaperon (with the notable difference of not having a helpful picture to follow in the plans unless you hold them up to a mirror), I haven't felt compelled to write much about it.




    It's also the case that I'm getting a little burned out on writing. Having just finished a major systems and processes documentation effort at the paying job, I had hoped for a week away from the keyboard (at least a week away from prose; I was enthusiastic about getting back to the ever more gratifying writing of C# code) to recharge. It wasn't to be. The game reviews that I write, those being of a feast or famine nature, chose last week to provide a feast. Five, FIVE reviews, right out of the blue. I enjoy doing them (or, obviously, I wouldn't do them) but they are a major time drain. A simple game or a piece of hardware take three to five hours each just in playing or research, then at least another hour or two to write. A complex game or a game that I hate (or both, in the case of the one that I've been putting off) can take much longer.

    So, one is published, one is written and staged for publish, and three yet to be written.

    In case you're interested, here's the one that's published:

    http://www.gamingnexus.com/Article/Need-for-Speed-SHIFT-2/Item3017.aspx

    And, if that's not enough, now it's mowing season. I hate mowing season. We had it all figured out, though. This year we'd pay Co-pilot Egg's boyfriend, Case, to mow for us. We'd pay him the money that we have already been spending by taking them to dinner with us or forking over a $20 when they want to go to a movie. The financial outlay will remain the same, but the lawn will get mowed too. It was the perfect plan, albeit cunningly nefarious. We couldn't in clear conscience (and by 'we', I mean my wife) put him on the poorly maintained mower I have grown to loath yet tolerate; no, we would have to have someone come clean/fix it up a bit.

    Over $300 later, it looked great! A new bearing somewhere down in the moving parts, new anti-scuff wheels on the mowing deck, and three brand new, pristine mowing blades rounded out the general cleaning and tuning. I showed Case how to start the thing and perform necessary operations like engaging the blades, move in forward and reverse, and set the parking brake. I then walked him around the palatial estate showing him areas where extra caution would be required to avoid damage to the mower or fixed assets on the property. I know whereof I speak; I myself have done brilliant things like running in the curbside water stop (which broke the weldments on the mower deck to the tune of $700+ in repairs, that burden thankfully being covered under warranty for some reason), the septic leach field standing vent pipes, the various pipes and hoses that run into and out of the manse itself, and getting stuck between a tree and the fence.

    Safe in the knowledge that I had adequately trained young Mr. Case, I trustingly sent him off with my spiffily cleaned and repaired mower, anxious to see how those brand new blades would cut the young spring grass.

    Not five minutes later, the blades were no longer virginally sharp, and the curb side water stop lay in ruins.


    Somewhat of a Karmic retribution, that.

    Sunday, March 20, 2011

    A big flap

    Well, actually, there are a couple of big flaps to talk about. Of course there is the big flap that I'm building to hang on the back side of my left wing, but there was also a different kind of flap in the RV-12 builder community last week.

    The story as I understand it is that my building buddy Kyle, lead singer and tambourine tuner for The Jackson Two, was installing a welded part in his RV-12 when a very disconcerting issue arose. The part in question is part of a chain of parts that work together to provide a linkage between the control stick and the flaperons. That's pretty important stuff; the flaperons are what allow a pilot to turn the airplane, or to prevent the airplane from turning of its own volition. Both are equally important to everything in the pilot's life, with the possible exception of retirement planning.

    Here's what the part looks like:


    Those flat plates with the holes in them are welded to the supporting tube and powder coated by Van's. In theory, anyway. As Kyle was preparing to match drill one of the plates, it fell off in his hands.


    Apparently that one had been tack welded to hold it in place for a weld that was never performed.

    Kyle immediately went to the Van's Air Force internet forum (which is independently owned and operated; it is not affiliated with Van's aircraft) and posted the following series of messages:
    This evening, we were getting ready to match drill the wd-1215 brackets with the wd-1214 flaperon torque tubes and the wd-1215 bracket flange came off in my hand. Looks like there was no welding other than a tac weld.
    There were a number of "Thanks for pointing that out - I will check mine immediately" types of replies, but it didn't take long for the fissiparous nature of the builder community to show. Mixed in were a number of messages stating that the building is the final inspector and in essence saying "Sh!t happens, it's your job to deal with it." Which, as I stated later once I got involved in the thread, is good advice that quite widely misses the point.

    But before it got that far, Kyle posted an update:
    Just called VANS. They are sending me two new WD1215's L and R. They said they have recvd a couple other calls this morning in regards to these parts. The parts person i spoke with said i should have called them (VANS) first before posting here. I take issue with that.

    One poster said he advised VANS in Feb 2010. That is a year ago and nothing was done.
    [Emphasis mine, remainder of message redacted to remain within fair use copyright rules]

    I have to confess that the "buck stops with you" attitude piqued my interest. I added:
    I wonder if a jury would see it that way, particularly in the case of an E-LSA where Van's Aircraft is the manufacturer of record. The E-LSAs are too new for that to have been tested in a courtroom and we all hope that it never gets tested in that way, but it does seem that a preponderance of caution on the part of Van's would be a good approach.

    I am also of the opinion that another of these defective parts showing up a year after the first known report with no record of a notice or bulletin being sent to assemblers does not inspire confidence.
    I've talked about the E-LSA rules here before, and the difference between that set of rules and the normal experimental aircraft rules. In a nutshell, with the E-LSA we are required to build exactly to the plans, but a normal experimental can be modified from the design by the builder. In exchange for the loss of autonomy in the build process, the manufacturer (in this case, Van's) remains as the manufacturer of record, and ostensibly the liable source should anything go wrong. With the other set of rules, the builder becomes the manufacturer of record and also takes on the liability.

    Not everyone understands that, though. To be fair, most people frequenting that forum have no interest in E-LSAs and have never had reason to familiarize themselves with the subtleties of the newer rules. That explains this reply:
    Lawsuits should never even be whispered about; it’s only bad for your hobby. I don’t know anything about LSA but as far as EAB goes it falls to the manufacture/builder and you don’t want it any other way because there would be no kits available for us to build.
    I agreed with this guy's sentiment, though:
    The response of Van's parts employee, if reported in context accurately, was a discouraging note, I thought. Hopefully, that doesn't reflect the attitude of the Van's staff as a whole and the employee will be counseled that, when a safety of flight issue is involved, it's perhaps not the time to rely on a single, formal line of communication.
    In fact, it is that statement from the unnamed employee that bothered me the most. It was enough to get me to wade in again, against my better judgement (which, to be fair, is pretty much par for my course):
    In the case of welds (and worse, welds covered by thick powder coat), I sure hope Van's isn't counting on me to find poor workmanship. I'm am neither qualified nor equipped to judge the quality of a weld. To put it bluntly, that is what I am paying Van's to do. Not all poorly welded parts are going to conveniently and fortunately fall apart quite as easily as Kyle's did.

    I also stridently disagree that discussion of potential lawsuits is somehow off limits. It is the world we live in and playing ostrich is not going to solve anything. I think it would be foolish to not consider where the liability lies with the airplanes we are building. One of the benefits of an E-LSA over E-AB is where the liability lies; you can't market the benefit when it's convenient and hide from it when it's not. We sign a contract saying that we upheld our end of the deal by building exactly to plans; the manufacturer has to hold up their end too by meeting their responsibility to make sure their product is safe.

    Finally, I find any criticism of Kyle's decision to share his experience with us abhorrent and frankly I'm shocked by it. I now can't help but wonder what other problems have been hidden from us. I understand the motivation behind it - credibility and trust once lost are very difficult to recover - but this is serious business here. There is no room in this industry for the hiding of problems like this.
    Van's released a service advisory regarding this issue very quickly, thus making the point about "calling them first" moot. For some reason, this was viewed as justification for arguing against any criticism of Van's, and somehow exculpated Van's of any responsibility for that part being shipped in the first place. One commenter went as far as saying that we all owed Van's an apology (which seems exactly backwards to me) and that "anyone that can't differentiate a tack welded part (powder coat or not) from a fully welded part should not be building an eab/lsa."

    That was a bit much for me, so I posted this:
    That's a fine point, as far as it goes. Given that it is the builder's life that's on the line, a high degree of last-chance quality control is certainly prudent. On the other hand, there are two parties in this transaction: one that may or may not have the requisite background and experience to know precisely how a weld is supposed to look, and one that has decades of experience in knowing precisely how a weld is supposed to look.

    Only one of those parties is selling those parts for profit. That profit is earned by doing the work that the first party can't do for himself, and ensuring that the work they do is complete, accurate, and safe.

    I'm the first to say that this could have happened to me just as easily as it happened to Kyle. I trusted (incorrectly, as it turns out) Van's to take care of the basics of quality control. They are a trusted manufacturer with years of experience; that factored heavily in my decision to purchase from them. I suspect a lot of us got a very low cost lesson through this incident; I know that I did. Education is half the of the "recreation and education" basis for building our own airplanes and I'm happy to have been taught a very valuable lesson about it, and I'm even happier that it came at no cost. There's no hiding the fact, though, that the cost could have been tremendously higher.

    Oh, and those decades of experience that Van's has? It would have been measured in months if the qualifications for building one of their kits included the abilities required to have built the thing from plans. I'm sure there are purists that believe the RV-12 was a mistake for Van's because it is targeted at inexperienced builders that don't have the chops to build a "real" airplane, but that changes nothing. The relative simplicity of the RV-12 attracts a builder that would never have attempted to build any of the other RVs - or at least one such builder, anyway.

    I speak for myself alone when I say that I clearly do not have the experience or knowledge to gauge the workmanship of every single part of the kit and that I am (was) leaning on Van's to do that for me.

    I make no apologies for that.
    Between that and the work I have to do on getting the RV-6 through its annual inspection, there were a few days that I stayed away from working on the RV-12.

    Which brings us back to Big Flap #1.

    All of those parts that I fabricated before needed to be attached to the flaperon spar. That meant match drilling.




    Those washers on the bolt running between the two parts are used simply to set the required spacing, near as I can guess. I would have preferred to have been given an explicit measurement, truth be told. Too much is at risk to trust that I found the correct washers mixed into the big bag o' washers.

    These are unclad aluminum parts and need to be primed:



    This part in particular was an interesting riveting job. Those holes near the vertical part require AN470 round head solid rivets, and getting that head up flush against the side of the vertical plate was going to be a problem. Fortunately, I learned a long time ago that Van's will tell you when the direction of the rivet matters; if they don't specify a direction, I just use whichever direction is easiest. In this case, I just inserted the rivet from the other side.


    Moving on to the little ribs, I found that in some cases the rib wouldn't fit into the spar straight in because the flanges of the spar were bent inward. I just put the ribs in at an angle, then straightened them up.




    The riveting of the ribs was the same as riveting the paddle: in some cases it was easier to bring the rivet through the rib and into the spar, in others it was easier to go through the spar into the rib. A few of the ribs used both options.


    Then I had to peel blue plastic off of the flaperon skins, one of my least favorite things to do.


    I had just clecoed the skins to the flaperon skeleton prior to riveting them on when I heard on the control tower scanner that the guy with the Piper Aztec hangared next door was taxiing in. I had the hangar door open, and this guy insists on blasting my hangar with a nearly full throttle blast of air when making the turn in front of his hangar before parking. That would have blown my wings off of the rack and done all kinds of damage. In the years he's been doing this and despite my having pointed out to him the mess he makes in my hangar when he does it, he continues to do it with reckless abandon. I decided that it would be a good idea to get the door down and move my car. It was close enough to quitting time that I just decided to leave the riveting until later.

    Sunday, March 13, 2011

    Fabulous flaperon fabrication

    This was the kind of weather that would have frustrated me to no end in the days before I had an airplane to build. Tauntingly blue skies were calling for me to either join them in the RV-6, or at least marvel at them during a long, destination-less drive in a convertible. Alas, winds that where blowing at 26 knots when they weren't really letting us have it, and at 34 knots when they really wanted to drive home the point, kept me on the ground, while temperatures just a few degrees below the level needed for even moderately comfortable top-down driving precluded an open-air ride.

    But these days, weather like that is just fine. I was able to spend a comfortable five hours working at the hangar.


    Having passed over the fabrication of some parts in favor of the more entertaining flap counterweight drilling, I had to back track to step one. As I was looking at the drawings of the part that I had to make first, it became much clearer to me why The Jackson Two had asked a local machinist to knock these parts out for them. As I mentioned before, there is something intimidating about all of those different measurements and radii and offsets and dimensions measured in 1/23" and, last but certainly not least, the critical nature of the part in question. You see, I just had to look ahead to see what this part is used for.

    The explanation is somewhat lengthy, but the crux of it is that the flat "paddle" part will fit into a slotted part emerging from the side of the fuselage. That slotted part will rotate when the pilot enters roll commands via the control stick and/or moves the flap handle. The rotation of the slotted part will be transferred to the "paddle," which will in turn transfer motion to the flaperon. So, at the end of the day it is this part that I am fabricating that will determine whether or not I can turn the airplane, or even maintain level flight for that matter.

    And yes, I will be making two of them, one for the left side, one for the right.


    The parts will be cut from a length of angle aluminum. I did a series of useless measurements and markings before realizing that the only line I needed for the first step was the one that would cut the raw material to the total length of the part. As you can see in the drawing, that is 2 29/32". I can only measure to 1/16" on the ruler I have, so I convert the measurement to something like 30/32", and then simplify to 15/16". I measure the part to the 15/16" on the ruler, then mark the part at the little gap between 14/16" and 15/16".

    I do that at two places on the part, then draw a connecting line between the marks to use as my cut line on the band saw.



    To form the paddle, part of the other bend in the angle will get sawed away. There's going to be lateral tension against that upright part, so Van's wants a stress-relieving 1/4" radius at the junction. They have us do that by measuring to a certain spot and drill a 1/4" hole. When we cut the two lines to remove the unneeded metal, we will cut them so they intersect at the tangent of the hole, thus leaving a 1/4" radius on one quarter of the hole. Or something like that. The pictures should explain it better than I can.



    I was trying to get the drill bit right flush up against the vertical part; you can see that I got it too close. Most of that part is going to get cut off anyway. I also cut off a thin strip on the horizontal part to narrow it down to the 1 5/8" width (surprisingly, it wasn't 1 19/32") called for in the drawing.


    Another hole as to be placed and drilled. This one is 3/16". I used a center punch to mark the location, then used a small bit on the drill press to get the bit perfectly centered on the mark before clamping down the part for final drilling. I think even with those precautions, I got the hole just a smidgen off from where it's supposed to be. Time will tell.

    There's a 3/8" radius around the center of that hole as shown on the planes. I used a little math to lay out the curve. Two times 3/8 is 3/4, so I measured 3/4" from the base to the top of the radius above the hole and marked the diagonal cut line from there back to the aft end of the part.


    I used the band saw to cut the diagonal (as is evident from the not-so-very-straight line) and to round off the corners of the 3/4" radius. Then I buffed the whole thing up with the Scotchbrite wheel.


    As I was working on the second part, Al the Tool Junky stopped by to see what was going on. He has a nice bench metal shear down in his hangar and offered to do the diagonal cut on the second part in the shear, the theory being that it would result in a cleaner, straighter line.

    It did.


    I was ready to quit for the day and was reading ahead to the next step when I realized that the holes that would have to be tapped didn't use the same size tap that I had bought for the wing tie downs. I said something to Al, and before you know it he not only had gone down to his hangar to get the tap but was fully engaged in the fabrication process. I had him cut the four 2" lengths of tie-down extruded aluminum on the band saw while I got the parts ready for the steps I will work on Monday night. There were eight more of those "narrowing" cuts to do (one on each side of the four 2" parts) and those too were beneficiaries of the metal shear.

    We worked out a process of getting the parts properly aligned for drilling in the drill press, then Al demonstrated the proper way to tap a hole that deep. I had been using Boelube to help lubricate the tap, but he showed me something that works better: he dripped a few drops of MEK (paint thinner wold have worked too) down into the hole and used a little candle wax rubbed onto the tap. It went much more easily than the wing tie-downs had for me!


    He took off after the first was done and I finished the remaining three. The first step is to align the part. We did that by putting a size N bit in the drill press and lowering it into the part. That forced the part into a good vertical alignment before tightening the hold of the vise.


    The next step was to replace the size N bit with a size Q bit. This is the bit called for in the plans for drilling the hole. A little MEK was used here too for lubrication. The drilling was very easy. The hole had to be drilled to at least a one inch depth; I put a black Sharpie mark at the one inch depth of the drill bit. The MEK washed most of it off, but it was enough to make sure that I get the hole deep enough.



    I like the way the shavings spiral up the bit.


    With the hole drilled, the tapping is simple.


    Here's the day's worth of fabrication. The four parts that needed to be tapped will get those tie rods screwed into them after they are mounted to the flaperon spars, two to a spar. The bearing in each of the tie rods will have a bolt put through it after being centered in the bearing brackets hanging off of the back of each wing. So, these fabricated parts are what will hold the flaperons onto the wing and allow them to pivot in the bearings in response to the command inputs transferred from the pilot through the paddle pieces (called "actuators")!


    Pretty heady stuff, isn't it!! These are some critically important parts.

    Wednesday, March 9, 2011

    Help, just when I needed it most

    Co-pilot Egg and Mr. Case helped me finish up the wing rack a couple of days ago so the work benches are now clear for starting the flaperons. Which, as it turns out, has only exacerbated other space issues.


    Yeah, just try to fly that thing now!

    I had new help for the flaperons. My new helper (who I will call 'Harley' because everyone here gets a nickname) is keen on airplanes and is fascinated by the construction process. Unfortunately, I invited him to come over on a horrible night. And I don't say that because it was pouring down rain. I say that because the first steps of the flaperon section are horribly boring, at least for anyone expecting to assemble stuff. Nope, the first step is one of those head-scratching fabrication jobs that involves a lot of measuring, cutting, swearing, and drilling.

    I don't mind these jobs, actually. They're a fun challenge, but there is one little thing that confuses me. I simply cannot figure out why Van's insists on every measurement being an odd nominator on top of a '32' denominator. The measurements are all 17/32" or 21/32" and the like. This might just be me, but I can't measure and cut to 1/32" inch. I suspect that the saw blade is wider than that! Since the 1/32" is a throw-away anyway, why couldn't they go for 16/32" or 18/32", either of which are easily reduced to more workable numbers? I'd rather reduce 16/32" to 1/2" or 18/32" to 9/16" to be perfectly honest. I'd sleep better if nothing else.

    So, rather than embarrass myself with blank stares and head scratching in front of Harley, I punted. Next page!

    The big tube is stainless steel and is intended to act as a counter weight on the flaperons. It has something to do with control flutter, I think. It doesn't matter, really. "Mine is not to question why..." I'll not continue that quote; it's a little too close to the mark.

    Here's the thing about the tube: it's stainless steel, and it needs to be match drilled. And that, my friends, is no mean feat. Match drilling into aluminum is not my favorite thing; match drilling into a nearly impermeable material was bound to be a real treat! The first step was to get the tube positioned.


    Then the first hole! I started with a very small bit (#46 since I've already broken every bit between #41 and #46) to get a good indentation to hold the #30 bit, then went at it with everything I've got, that being the air drill, some Boelube, and a great deal of pressure. This is where having Harley there to hold everything still while I shoved on it with a power tool was a tremendous help. Honestly, I don't think I could have done it without him.



    Here's something I almost missed. If I hadn't read ahead and seen a directive to remove the #40 clecos before match drilling into the little ribs, I wouldn't have noticed that I needed to have them in there in the first place.



    After drilling all of those holes into the tube (I think there were eight or ten, at least), drilling into those aluminum ribs was sure easy!

    Wednesday, March 2, 2011

    Perfect timing. Or not.

    We're having wonderful weather this week with blue skies and temperatures in the 40's and 50's. This is, of course, perfect weather for spending a few hours a day out in the hangar working on the RV-12. It's also nice to spend what remaining time I have in the presence of my wonderful RV-6. Yes, the RV-6 is going to be listed for sale in the next few days. I've been consulting with a guy that can only be considered a well respected expert when it comes to anything RV, up to and including the buying and selling of them.

    Why does selling my plane require input from an expert? That's a good question and the answer comes down to one thing: emotional attachment. I didn't build my RV-6 so I don't have the deep emotional investment that would come from being the planes progenitor, but to say that I can't possibly have become deeply attached anyway would be to say that a parent can't possibly have a deep and abiding love for an adopted child.

    Where this emotional attachment becomes a problem is when it comes time to make realistic and pragmatic decisions on topics like asking price, preparation work, minor repairs, and the like. What the plane is worth to me is not necessarily what it will be worth to a dispassionate buyer, in other words, and spending a lot of money making little fixes may not be a wise investment.

    Even making the decision to list the plane now was difficult. It might sell quickly and deprive me of the ability to fly in the nice Spring weather, or it make take ages to sell, depriving me of the space I will need for the RV-12 soon after starting the finishing kit. It's impossible to tell if my timing is right or not. If past efforts at achieving perfect timing are any indication, however, it won't be.

    Case in point: I finished closing out the wing tip of the right wing yesterday. Looking ahead in the plans, I see that the flaperons are next. The parts for those are back home in the basement shop, so I got to thinking that I could probably just build them there. The timing of that thought is horrible. After all, wouldn't that have been the perfect thing to think of, say, in January??

    By the way, I received a couple of helpful replies to my pondering over what to do about having forgotten to pull the fishing line through the wing to use later if I decided to install a lighting kit.

    Anonymous said...
    To retrofit tip lights, you cut a oval hole (about the size of a flattened softball) into the underside of the tip, near the handhold. The instructions provide a template. You would reach your hand in and grab the string and pull the new wires. There are only a couple of rivets you have to take out as well, in order to rivet on a new fiberglass piece that the tip lights mount to. That piece covers the hole you cut so it does not have to be neat. So you would really miss having the string!

    Now for the right wing you have to cut the landing light hole. This is a small hole too but does give you a bit of access to the front of the ribs where the snap bushings are. But installing the landing light through that hole is going to be like endoscopy. I did it from the back before doing that upper wing skin. Tough decision. I actually left in a string even after installing the lights! An extra wire between the tip lights makes them stay in synch. You could also add a wire to switch the strobes separate from the position lights. I did not do either of these.

    Bill H.
    February 28, 2011 8:23 PM


    Torsten said...
    IMHO, inserting the fishing line right now is way easier than trying to do it through that tiny cut out in the wingtip that you'd open for the nav light fairing. It is also positioned at an awkward angle that would make it almost impossible to get your hand to the snap bushing in the outer wing rib through this hole unless you could get Egg's helping (small) hand to do it.
    March 1, 2011 11:05 AM
    Excellent advice. Which I chose to ignore.

    Why? Well, I got to thinking that I ought to go ahead and find a way to push that fishing line through the bushings in the ribs. That would involve getting a long, thin stick to push in through the ribs, starting at the wing root. I then realized that because the wings are easily removable, the wing root will always be accessible to me. I might still have done it except for one thing: I also realized that I don't plan on ever spending $1,300 for lights - the RV-6 doesn't have them, and I have never missed them.

    I still appreciate the time that Torsten and Bill put into their replies, though.

    Monday, February 28, 2011

    Wow, what a difference [insert appropriate temporal period here] makes!

    It's a trite expression. I'm so tired of hearing it that I actually cringe whenever someone says it. Actually, I think I've moved beyond 'cringe' and now grind my teeth. All of that having been said....

    Wow, what a difference a day makes!

    Yesterday I enjoyed temperatures in the high 50's accompanied by a light breeze and soft blue skies by shooting a round of sporting clays in the morning and working on the RV-12 wing in the afternoon. The shooting didn't go nearly as well as it did my last time out. You may remember that I had a brand new ("to me," as the impecunious like to say) shotgun last time out, and scored a 22 out of 50 with it. This time around I shot 9. The message here is clear: I need to buy a new shotgun every two weeks.

    This morning I drove to work in a Mitty-esque drama that was something akin to flying a B-17 through thirty miles of flak to deliver a load of bombs to the oil fields of New Albany, Ohio. Well, minus the abject, visceral terror of getting blown out of the sky, anyway. With the flashes of lightening in the night sky playing the visual role of flak bursts and the violent slaps against the side of the car from the gusty winds, it was easy to slip into the role of Squadron Commander Dave.

    Or it would have been if I wasn't drenched; having failed to buy gas the day before when the weather was nice, I was forced to stop before making the long trek to work. As I stepped out of the car, there was just a light drizzle. Just as I started pumping gas, though, the clouds broken open with a deluge and the winds behind it forced it horizontally under the roof over the pumps. Fortunately I was there to block most of it or the pump might have gotten wet. And what a shame that would have been!

    Still, as I was battling my way north with the winds pounding against the flanks of the car and the deep puddles on the highway trying to wrest control of the steering wheel from my white-knuckled hands, I was able to think a few positive thoughts about the pouring rain:

    - I had picked a great weekend to replace my worn wiper blades with a pair of brand new (really brand new, not "to me" brand new) Rain-X Latitudes. I had AutoZone install them on my car, but also bought a pair to take home for the wife's car. I couldn't figure out how to get the old ones off and the included instructions offer no assistance on that topic, so I offered Egg the opportunity to take the car back up to AutoZone and get some help. Where's the opportunity for her in that? Well, anytime you can mock your daddy for his ineptitude, well.... kids love that!

    - It wasn't snowing.

    - It was washing the accumulated salt off of my car - another thing I had failed to do over the weekend.

    - It's Monday and I would only be inconvenienced while driving to work as opposed to a rainy weekend day when the whole day would be a write-off.

    That's as far as I got with happy thoughts before I caught up with a truck and added temporary road blindness to my list of woes. Man, do those things ever throw up a bow wave!

    It was a productive weekend by any measure. On the topic of the RV-12 (oh, and let me now say "Welcome" to those of you that are well versed enough with my preliminary ramblings to just scroll down to the first picture), I was able to get to the point where all that is left to do is to seal the wingtip. I would have gone ahead and done that, but I ran into a situation that I wanted to spend some time thinking about first. We'll get to that in a minute.

    First, I found a better way to break the irritatingly-dimpled edge of the wing walk doubler. I'm a huge fan of the converted visegrip edge breaking tool, but it simply wouldn't work with those dimples in the way. The original edge breaking tool that I bought (and hated when trying to break the edges on the tail cone) worked much better.


    Riveting the doubler, just like everything else about this wing, seemed easier this time around. I still had to do a Mitty-esque farm veterinarian thing to get the ribs lined up correctly, though. Mooo!


    So, there's the right wing mostly done.


    The hangar is getting mighty crowded. I've all but decided that it's time to start the more-than-likely lengthy process of selling the RV-6. I need the space. It's due for annual inspection in March and I hate to spring the $$$s (and working hours) for that when a pre-buy inspection is likely to be right around the corner. As much sense as it makes to get busy with selling it, it's still a horribly difficult decision. I'll sure miss it when it's gone!


    I started on the wing tip. This too went much more easily the second time around.



    Until, that is, I was getting ready to close out the wing tip and noticed that I had forgotten to run a length of fishing line through the wire bushings in the ribs. The fishing line would someday be used to pull through electrical wires for navigation, strobe, and landing lights if I were ever to decide to install a lighting kit. I have no plans to do so at this point, but someday I might. I'm trying to decide if it's worth doing now, or if it would be just as difficult to do now as it would be to do at the time I (maybe) install the lights. It all comes down to whether or not the wing tip has to be re-opened to install the nav lights for not. If so, same pain then as now. If not, slightly less pain to do it now.

    Sigh. Another tough decision.

    Monday, February 21, 2011

    Another way to skin a wing

    The left wing took me almost two weeks to get skinned, mostly because I could only squeeze in one panel every couple of days or so. Each panel took something longer than an hour. The right wing, on the other hand, has gone much quicker as a result of having help. I've mentioned before that having two people working on a riveting job is more than the twice as fast as one working alone. That's counter-intuitive, but you have to factor in the time lost to tool changes. With two people working, each focused in a specific task, there is far less time spent putting down one tool in order to use a different tool.

    The math for three people working on the job is a little different. With three working, there's only a little performance bump over two working, although it's still a measurable improvement. Enough of an improvement, it seems, that we were able to get all three of the top skins on in one session. Co-pilot Egg invited her newest Friend-That-Is-A-Boy (as opposed to the highly connotative word 'boyfriend' - I don't want to be the cause of any arguments between them) to help. I've found that it's best when enlisting help of this nature to catch it in the early days when they're still trying to impress her Dad. Within just a few visits they lose some of the awe for some reason, and feel perfectly comfortable in declining such a generous offer to assist in building an airplane.

    Sigh.

    Teenagers.

    That having been said, Case (not his real name, but for trivial reasons I think it will make a good blog-name) seemed to have a good time. He picked up the rhythm of the riveting with ease and withing minutes was pushing the rivet placer to speed up her pace.


    We had the three panels on in less than an hour and a half. Once I was comfortable that Egg was supervising competently, I went on to the next step: prepping and priming the wing walk doubler.

    Here's the team photo: